Retrofit ROI calculator
A new control system saves labour, energy and losses. Estimate the annual saving and when the investment pays for itself.
Result
- Annual saving
- €82,200
- Payback period
- 3.0 years
- Net result after 10 years
- €572,000
- Return on investment per year
- 32.9 %
Annual saving by area
How we calculate this
- Labour
hours · hourly cost · reduction - Energy
kWh · price · reduction - Storage losses
tonnes · loss rate · grain value · reduction - Payback
investment / annual saving, 10-year net result10 · saving − investment
Assumptions: savings start in year one, with no interest, subsidies, service contracts or price changes. The default reductions are cautious values from typical silo and mill control modernisations.
Want to improve this?
Talk to an Automatech engineer. We automate and modernise silos, dryers and mills in Austria and South-East Europe.
Disclaimer: The results of these calculators are non-binding estimates for orientation only and are not engineering advice. They are based on your own inputs and simplified assumptions, and do not replace a professional on-site assessment, planning or a quotation. To the extent permitted by law, Automatech OG accepts no liability for decisions made on the basis of these results.