Automatech AgriToolsby Automatech OG

Downtime cost calculator

Every hour of downtime costs margin and ties up staff. See what unplanned stops cost per year and what less downtime would save.

Your inputs

Everyone waiting or repairing, per hour in total.

Spare parts, restarting, spoilage, penalties.

Assumptions (editable)

Default values from our configuration. Adjust them to your plant.

Through condition monitoring, diagnostics and modern controls. 30 to 50 % is common in projects.

Result

Downtime cost per year
€100,500
Cost per hour of downtime
€670
Lost production
3,000 t
Saving with 40 % less downtime
€40,200 per year

What the downtime cost is made of, per year

  • Lost margin€75,000
  • Staff€18,000
  • Other€7,500

Get a detailed PDF report

All inputs, results, formulas and assumptions on one page to save or share. If you like, an engineer will get back to you with an assessment.

How we calculate this
  • Lost margin throughput · hours · margin
  • Staff hours · staff cost per hour
  • Other hours · other cost per hour
  • Savings potential total · reduction

Assumptions: lost production is not made up later. If you recover it with extra shifts, use the extra cost per hour instead.

Want to improve this?

Talk to an Automatech engineer. We automate and modernise silos, dryers and mills in Austria and South-East Europe.

Disclaimer: The results of these calculators are non-binding estimates for orientation only and are not engineering advice. They are based on your own inputs and simplified assumptions, and do not replace a professional on-site assessment, planning or a quotation. To the extent permitted by law, Automatech OG accepts no liability for decisions made on the basis of these results.