Harvest intake bottleneck
During harvest, the slowest step decides how long trucks wait. Find out whether intake or drying is your bottleneck and how large the backlog grows.
Result
- Daily capacity gap
- 567 t
- 22.7 trucks per day left waiting
- Backlog after the peak
- 5,667 t
- 227 truckloads
- Days to clear the backlog
- 11.7
- Bottleneck
- Dryer
- Intake 1,400 t · Dryer 933 t · Arrivals 1,500 t per day
Backlog at the end of each day in tonnes
Harvest peakClearing afterwards
How we calculate this
- Arrivals per day
A = trucks · load - Intake per day
Ci = intake capacity · hours - Drying per day
Cd = dryer capacity · hours / share to dry(grain that needs no drying bypasses the dryer) - Daily capacity
C = min(Ci, Cd), gapA − C - Backlog after the peak
B = max(0, A − C) · peak days, in trucksB / load - Cleared afterwards at
C − A · share after peakper day:days = B / (C − A · share)
Assumptions: even arrivals, no wet holding before the dryer, no breakdowns. Wet holding bins move the bottleneck but do not shorten the drying time.
Want to improve this?
Talk to an Automatech engineer. We automate and modernise silos, dryers and mills in Austria and South-East Europe.
Disclaimer: The results of these calculators are non-binding estimates for orientation only and are not engineering advice. They are based on your own inputs and simplified assumptions, and do not replace a professional on-site assessment, planning or a quotation. To the extent permitted by law, Automatech OG accepts no liability for decisions made on the basis of these results.